日本xxxx丰满老妇_国产在线精品视频_日本黄色一级_风韵丰满熟妇啪啪区老老熟女百度_妺妺窝人体色WWW在线_懂色中文一区二区三区在线视频
hotline:
010-53033961
中文
Home
About
News
Product
Service
Case
Contact
hotline:
010-59393252
×
GLP I-Park Shenyang (Benteler Phase II Expansion)
time:2019-04-10
hits:4607次
source:正弘奧能
<p> <span><strong><span style="font-size:16px;">Project Name:</span></strong><span style="font-size:16px;"> </span></span><span style="font-size:16px;">GLP I-Park Shenyang (Benteler Phase II Expansion) Project</span> </p> <p style="text-align:justify;"> <strong><span style="font-size:16px;">Project Location:</span></strong><span style="font-size:16px;"> Shenyang Economic and Technological Development Zone</span> </p> <p style="text-align:justify;"> <strong><span style="font-size:16px;">Project Overview:</span></strong><span style="font-size:16px;"> GLP I-Park Shenyang (Benteler Phase II Expansion) project is located at Shenyang Economic and Technological Development Zone. Including production plants, the total construction area is approximately 10,400 square meters, and it mainly produces key automotive parts.</span> </p> <p style="text-align:justify;"> <br /> </p> <p style="text-align:justify;"> <strong><span style="font-size:16px;">Project Features: </span></strong> </p> <p style="text-align:justify;"> <span style="font-size:16px;">1. Large window and door area, resulting in large heat transfer coefficient in the enclosure structure</span> </p> <p style="text-align:justify;"> <span style="font-size:16px;">2. Doors open frequently, and the intrusion of cold wind consumes a lot of heat.</span> </p> <p style="text-align:justify;"> <span style="font-size:16px;">3. Large temperature gradient inside the architecture, significant air stratification, which causes the top to be warmer and the bottom to be cooler, resulting in faster heat dissipation from the roof</span> </p> <p> <br /> </p> <p style="text-align:justify;"> <strong><span style="font-size:16px;">Equipment Usage:</span></strong><span style="font-size:16px;">We have chosen to use 5584 meters of ECOPAN infrared hot water radiant panels for this project, which fully reflects the advantages of using high-power hot water radiant heating equipment in large spaces.</span> </p> <p style="text-align:center;"> <img src="http://www.zuiaijishao.cn/Uploads/image/20190410/20190410215811_51651.jpg" alt="" /> </p>
prev:Changchun FAW Automotive Stamping and Welding Parts Production Base-C Plant Project
Returns a list of
next:Hebei Construction Group Co., Ltd. Beijing New Airport Engineering Flight Zone Service Facilities Project